HOME
::
CONTACT
::
GLOSSARY
::
SITEMAP
PHASE 2 - PROJECT OBJECTIVES/MILESTONES
Phase 2 Overview
|
Objectives/Milestones
|
BOS/TAC Meetings
|
CAC Info
|
Public Outreach
|
PMT
|
Schedule
|
Document Library
PHASE 2 - PROJECT MILESTONES
Identify Noise Management Measures
Associate major aircraft noise concerns for each CAC community through discussions and/or survey information collected by IC in Phase 1 (PDF
7 mb
).
- completed
Develop an efficient process for CAC to brainstorm and identify concepts that address noise concerns (PDF
28 kb
).
– completed October 2007
Review 12 concepts from Phase 1 that were assigned to Phase 2 evaluation to determine if CAC continues support for those measures (PDF
30 kb
).
– conducted between October 2007 and January 2008
Identify concepts that can potentially provide a noticeable reduction in ground noise (PDF
633 kb
).
– completed November 2007
Identify new concepts that may address major aircraft noise impact concerns (PDF
4 mb
).
– completed January 2008
Back to Phase 2 Objectives/Milestones
Existing Conditions Aircraft Noise Analysis
Existing Conditions Aircraft Operations Analysis
Identify Noise Management Measures
Level 1 Screening Analysis
Level 2 Screening Analysis
Level 3 Detailed Analysis
Preferred Alternative Analysis and Conclusion