HOME  ::  CONTACT  ::  GLOSSARY  ::  SITEMAP
Boston Logan Airport Noise Study
left image Welcome Study Phase 1 Phase 2 Phase 3 Document Library right image



Text Size Decrease Font Size Increase Font Size

PHASE 2 - PROJECT OBJECTIVES/MILESTONES
Phase 2 Overview | Objectives/Milestones | BOS/TAC Meetings | CAC Info | Public Outreach |
PMT | Schedule | Document Library

PHASE 2 - PROJECT MILESTONES

Existing Conditions Aircraft Operations Analysis

  • Collect airport operation statistics (radar flight data, airline schedule data, airport layout plan, etc.) – conducted between December 14, 2006 and November 5, 2007
  • Construct airport and air traffic routing and flight procedure rules and assumptions for each of the six major configurations. – conducted between January 1, 2008 and December 16, 2008
  • Calibrate the airfield/air traffic model (PDF 5.2 mb). – completed September 2, 2009
  • Determine representative design day or peak month average weekday for the existing condition year and flight schedule. – completed November 5, 2007
  • Calculate airfield/air traffic delay statistics. – completed December 16, 2008
  • Document existing conditions average delay statistics and analysis (PDF 16.7 mb). – completed September 2009
Back to Phase 2 Objectives/Milestones






Existing Conditions Aircraft Noise Analysis

Existing Conditions Aircraft Operations Analysis

Identify Noise Management Measures

Level 1 Screening Analysis

Level 2 Screening Analysis

Level 3 Detailed Analysis

Preferred Alternative Analysis and Conclusion