A detailed aircraft noise comparison analysis was conducted for each of the 13 Early Implementation Alternatives to quantify changes in both cumulative and single-event levels.
CAC reviewed both the individual measure and combined measure results and voted to recommend nine (9) of the 13 for implementation. The steps taken included:
13 Detailed Flight Procedures Developed and accepted by BOS/TAC on June 2006.
Aircraft operations were modeled for each measure using accepted noise metrics and discussed at the November 8, 2006 BOS/TAC meeting. Documents used in the meeting included:
The following flash presentation depicts existing conditions and each Early Implementation Alternative (Macromedia Flash Plug-in Required. The Flash Player can be downloaded here.):